
Last week was full of wait.

We waited until the rain stopped...

until the water receded.

We waited on the plumbing inspector.
That there is the framing for the tub...
it's about 4-inches too wide.

And that there is the shower...
it needs to be about 4-inches wider.

We waited on the electrical inspector and the framing inspector.
It was a quiet week last week.
I hope this week we make a little more progress.
Living in disarray,
rolo
No comments:
Post a Comment